A key element of the higher than given 3 section approach is that the assessment of a hydropower plant throughout the diagnosing section. it's a vital tool providing the idea for the event of potential modernization or upgrading situations in associate degree early coming up with section. within the following, four major activities with concentrate on the protection and life cycle aspects are going to be mentioned.
1. General examination and knowledge assortment

This activity forms the idea for the subsequent steps in an exceedingly hydropower plant assessment. On the one aspect, several knowledge is analysed in sort of a desktop review of obtainable info provided by the hydropower plant owner.


- Studies of the hydrological theme, drawings

- Inspections and maintenance reports

- Operation logs, commission and web site check reports

- Operation and maintenance manuals

It has to be unbroken in mind that knowledge from existing drawings or records don't seem to be forever reliable since changes operational conditions or style modifications might need been enforced within the past.

It is conjointly the task of a visit or examination on the opposite aspect to spot such deviations. The assessing engineers UN agency undertake this work ar generalists with a broad level of data covering all aspects of the plant. associate degree in-house developed examination matrix facilitates to outline the assessment scope before the examination which might help beside hydropower plant owner to seek out the foremost appropriate temporal order for the assessment. throughout the positioning visit

systematic check lists & questionnaires support within the communication throughout the shut dialogue with owner and therefore the important web site personnel. principally visual inspections and easy measurements ar undertaken during this section to attain an outline of the initial und current strength & performance of the units. associate degree examination report summarizes the results of this 1st examination section that is given to the ability plant owner UN agency will decide according the report‘s recommendations (e.g. any check and measurements, elaborated examination that need ar partially disassembly of the unit) regarding the any continuing.
2 elaborated Inspections and Material Tests

The outcome of the primary general examination as represented in vi.1 may explain to perform a a lot of elaborated analysis sure components or systems. this may embody an extra assortment of geometric or operational knowledge. Verifications of actual dimensions, clearances, wears and checks of temperatures and flow rates, e.g. within the cooling system, ar standing within the foreground. conjointly non-destructive testing (i.e. hardness check, surface roughness, magnetic particle check, dye penetrate check, unhearable test) ar common tools employed in this assessment step to visualize material properties and damages. In most of the cases partially disassembly of the unit is needed to induce access to the objects of interest.
3. Measurements

In reference to the protection and life cycle aspects the most measurements for the mechanical half ar already mentioned. The mechanical integrity check is extended by hydraulic measurements (relative and absolute potency test) which is able to show the particular performance of the unit and delivers vital input parameters (flow rate, element losses) for the new hydraulic style. Transient tests (pressure fluctuation tests) ar relevant just in case of planned changes in operative conditions or general changes within the mechanism (increased flow, installation of further units).

In case of inaccessible dimensions or pure mathematics of key components which is able to be unbroken for the planned modernization or upgrading state of affairs associate degree instrumented web site mensuration of the image dimensions is performed. The ensuing pure mathematics models ar wont to perform hydraulic (CFD) similarly as mechanical calculations (FEM) that ar represented within the following chapter.